السنة | 2020-09-10 |
---|---|
التخصص | ماجستير إدارة المشاريع الهندسية |
العنوان | Optimization of managing construction projects activities via the application of genetic algorithm |
اسم المشرف الرئيسي | انس ناصر عيسى الربضي | Anas Al-Rabadi |
اسم المشرف المشارك | إبراهيم عبد محمد | Ibrahim Abd Mohammed |
اسم الطالب | صهيب زياد خليل قريضه ابو عيشة | Suhaib Ziad Abu-Eisheh |
Abstract | Project management prior almost three decades have many challenges and constraints including laborious tasks and hand operated project activities scheduling, besides long manual project calculations and time-consuming cost analysis. Genetic algorithm (GA) has simplified for project managers diverse large-scale projects monitoring and administrating and allows them control quality of the projects through unique solution methodologies which take decision through multiple selection steps in order to find the optimized. In this work, GA is applied as a case study for constructing a road project near Amman, the capital of Jordan, with total length of 1.16 km as well as a total width of 16 meters. After conducting this work, it was found that GA has chosen the one option between three ones provided in order to completely achieved the twelve activities of road construction project using the least amount of both cost as well as time. It was found that the costliest activities were bituminous first- and second-layers execution. Additionally, G6 was the best generation that corresponded to a cost of 1,085,128.5 JD, i.e. 1,530,524.9 US$. The fitness value of cost and duration is 43.43, and duration needed to execute the activities of the road construction project is 365 days. This work recommends many points to enhance the outputs from GA process. Keywords: Construction Project, Project Management, Genetic Algorithm, Optimization, Daily Cost, time planning. |
الأبحاث المستلة |