السنة | 2020-07-01 |
---|---|
التخصص | ماجستير إدارة المشاريع الهندسية |
العنوان | Implementing quality manaqement system for Jordanian water projects |
اسم المشرف الرئيسي | غيداء عبد الكريم احمد ابو رمان | Ghaida Abu Rumman |
اسم المشرف المشارك | | |
اسم الطالب | عدنان علي يوسف الجنابي | Adnan Ali Yousif Aljanabi |
Abstract | The water in Jordan was in fact poorly controlled. recently, water consumption has tremendously increased which affected the sustainable supply. the shortage was covered up by newly dug underground wells. Jordan is one of the poorest top-ten countries in water worldwide. Its population increases. water is known to be a fundamental and basic element in social and economic life whose shortage causes a lot of problems. water shortage can be handled through cooperation of individuals utility manager and government officials. Quality management tolerates the activities specified by the organization with regard to policies objectives, and responsibility in order to achieve the set goals System integrated analysis identifies management actions that minimize costs and maximize benefits throughout a diversified shortage condition. Techniques of the current quality management of the implementation errors in water projects will be reviewed. A survey will be carried out on water project sites in Amman. The result of the investigations will be statically analyzed to measure the normal distribution of quality management of the implementation errors in water projects Recommendations will be proposed to enhance the quality management of the implementation errors in Jordanian water projects. The research will try to provide answers to the main questions which are related to the causative factors of project implementation errors in Jordanian water projects. statistical analysis all factors causing implementation errors according to the population target, identifying the ten top factors and evaluating to three important effective factors will be tacked. All these factors rank according to the position and experience for the parties. A workshop-day with experts attending and discussions and viewpoints explained the three important design errors factors and some recommendations were suggested. KeyWords: Quality, Water projects, Jordan. |
الأبحاث المستلة |